FILTRATION

Note: Fields marked with an * are required. State/Province and Zip are only required for USA and Canada.

Date: Date Req'd:
Job Name*: Existing Aqua Plant:  Yes    No
City*: Est. Install Date:
Country*:    
State/Province*:    
Zip*:    
Eng./Owner: Transmit Via :
Eng. Location:    
Contact*: Transmit To:
Phone*:  
Fax:  
E-mail*:  

Wastewater Type:
Municipal
Industrial
  Type of industry:

Type of solids to be filtered:

Waste Characteristics:
MG/L   FILTER
INFLUENT
REQUIRED
EFFLUENT
BOD5  
TSS (AVG)
  (PEAK)
TURBIDITY NTU (AVG)
  (PEAK)
TOTAL P  
PH  
OTHER  
Peak
Flow:
Avg: MGD
Max: MGD
Peak Hourly: MGD
Peak Flow Duration: hrs.
Industrial
Flow Pattern:
hrs./day     days/week
   

Site Conditions:
Elevation: MSL
Temperature:   Winter         Summer          
  Ambient: ºF ºF  
  Sewage: ºF ºF  

Secondary Treatment:
Type: Activated Sludge
  Aerated Lagoon
  Bio Tower
  Extended Aeration
  Trickling Filter
  Other 
Operation: Nitrification
  Denitrification
    Approximate Sludge Age (Days): 

Secondary Clarification:
Secondary Clarifier(s)
Settling Lagoon
  Please send a treatment process flow schematic/description, if available.
 

Chemical Feed:
Types of Chemicals Purpose Approximate Dosages (mg/l) Feed Location Approximate Residence Time
1.
2.
3.
Note: Coagulants and/or polymers may be necessary to improve filtration performance

Filter Application Specifics:
Concrete
Package
Retrofit
  Existing basin configuration:
  Space limitations:
Redundancy required
@ Average flow
@ Peak flow

Additional Information: